Roofing subcontracting · Greater Houston

Your next roof.
Our crew.

Roofing labor for contractors who need a crew for their next project—or a backup when the schedule fills up.

Work directly with Jesus Morin. English and Spanish.

6–18Scalable crew capacity
2-yearLabor workmanship warranty
Two methodsGun-nailed & hand-nailed
Straightforward labor rates

Know the numbers.
Plan your next project.

Subcontracting labor pricing per roofing square (100 square feet), unless otherwise noted. Steeper or unusually complex roofs require job-specific pricing.

INSTALLATION OPTION 01

Gun-nailed

Roof pitch1 story2 story
5–7$80/sq$85/sq
8–10$85/sq$95/sq
INSTALLATION OPTION 02

Hand-nailed

Roof pitch1 story2 story
5–7$85/sq$100/sq
8–10$95/sq$120/sq

Steep-slope pricing: pitches steeper than those listed must be discussed and approved before work begins.

Additional labor

$40/sqDouble-layered shingle roofs
$25 eachDecking / roof repair
$10Per ridge vent opening
$350Add chimney cricket
$250Reflash chimney counter flashing · labor only
$25/sheetFull re-deck labor, plus standard shingle labor

Existing felt removal and full decking replacement conditions are detailed below.

See the work

From the deck
to the finished roof.

A selection of project photos supplied by our team.

Built around your schedule

The crew size
your job needs.

Our experienced roofing crew ranges from 6 to 18 workers, allowing us to adjust manpower to the size and demands of each project.

Our production target is a typical 30-square roof in one working day. A typical 50-square roof may require approximately one to one-and-a-half working days.

Production depends on pitch, complexity, weather, material staging, and jobsite conditions. These are targets, not guaranteed completion times.

Humble based · Houston wide

Greater Houston.
One point of contact.

Humble · Houston · Katy · Sugar Land · Pearland · Pasadena · The Woodlands · Cypress · Spring · Baytown · League City

And surrounding communities. Contact Jesus to discuss your project location and crew availability.

Before work begins

Scope, standards & jobsite details.

Existing felt / underlayment removal

Base roofing prices assume the existing felt paper remains in place when there is only one layer. If removal is required, two layers of felt are +$8/sq and three layers are +$15/sq.

Full decking replacement (re-deck)

When a full decking replacement is required, labor includes standard shingle rates plus $25 per sheet of decking installed.

Example: for a 30-square, one-story roof at $80/sq, shingle labor is $2,400. Assuming about three sheets per square (90 sheets), decking labor is 90 × $25 = $2,250. Total labor: $4,650. Actual sheet counts depend on the project.

Workmanship & jobsite commitment

We take pride in clean, precise, professional roofing work. Our crews are expected to follow the approved scope, maintain a safe and organized jobsite, and complete installations without unnecessary shortcuts. We also make every reasonable effort to keep production moving. If ordinary tools or minor materials are unexpectedly needed during the job, our team will make reasonable efforts to obtain them promptly rather than unnecessarily delaying the project.

2-year labor workmanship warranty

Completed roofing projects include a 2-year workmanship warranty covering installation-related defects attributable to our labor. The warranty does not cover material defects, storm or weather damage, structural movement, pre-existing conditions, work performed by others, or concealed conditions outside our control.

Concealed components & incidental damage

Roofing work involves fastening through roof decking and working around building components that may be concealed from view. Plumbing lines, gas lines, electrical wiring, refrigerant/AC lines, and other utilities may sometimes be installed unusually close to the underside of the roof deck or in locations that cannot reasonably be identified before roofing begins.

Concealed water, gas, electrical, and mechanical lines: We are not responsible for damage caused by roofing fasteners or normal roofing operations to concealed pipes, lines, wiring, ducts, or other components that could not reasonably be seen or identified from the roof surface before work began. Any known unusually shallow or vulnerable utilities should be disclosed before work starts.

Air-conditioning issues: If an AC system stops operating during or after roofing work, we will cooperate in having a qualified technician inspect the system to determine the cause. If the issue is reasonably determined to be related to our roofing work, we will contribute 50% of the reasonable repair cost, unless a different written agreement is made for that project. This does not apply to pre-existing equipment failures or unrelated mechanical problems.

Window screens and similar exterior items: Reasonable care will be taken around windows and exterior finishes. If a window screen is accidentally damaged by our crew, we will provide the reasonable materials needed to repair the existing screen. This provision does not automatically include replacement of the complete screen assembly unless separately agreed in writing.

Important: These provisions are intended to address hidden or pre-existing jobsite conditions fairly. They do not waive responsibility for damage caused by negligence or intentional misconduct, and any project-specific written agreement will control if it differs from this overview.

Your next project starts here

Need a crew?
Let’s talk roofing.

Jesus Morin · English / Spanish
Send your location, roof size, pitch, and target start date.

832-718-0919